Daily photographs by HANS VON RITTERN, with humorous, artistic and social commentary on life in the big city.

Photo of the day: REASSURING THE SHORE AT CONEY ISLAND

CONEY ISLAND PIPELINE©
Photo of the day: REASSURING THE SHORE – I am taking my German tourist guests on my 5 hour long tour of Brooklyn today, via Harlem Spirituals Tours. From the Fulton Ferry landing at the Brooklyn Bridge allllllll the way to Coney Island for a Nathan’s hot dog lunch – wunderbar! Our last and final stop will be the 5 Pointz Graffiti museum as a surprise ending 🙂
At Coney Island for the past few weeks we have been met by this long pipe snaking along the beach. Early in September the $7.2 million Army Corps of Engineer’s project to pump 600,000 cubic yards of sand along Coney Island’s shore began. Although the beach closed for the summer after Labor Day and red flags indicated no lifeguards were on duty, there were a few sunbathers and swimmers adjacent to the area where the work is getting underway.
While restoration work is going on, there were rolling closures of roughly 1,000 foot wide sections of the beach where construction work is active, according to the Army Corps of Engineers (ACE). The beach nourishment project extends from West 37th Street to Brighton Beach, and is expected to be completed in the fall.
Coney Island was hit hard by Super-storm Sandy and soon, its beaches will be well on their way to being protected against future flooding. There’s a ship out on the horizon pumping the sand from the ocean’s floor (and surprising a few startled crabs I bet) and pumping it methodically onto the beach where it is sifted and raked. You can hear the rumbling of the stones and shells as they go whizzing by inside the large rusty pipes lining the beach. Soon we will be enjoying pristine sand to stick our toes into! Join us?!

Leave a comment